The highlights of laying tile will perform independently a substantial part of the repair in the bathroom, as well as control the actions of the workers if finishing professionals trust.

Laying Tile In The Bathroom: Instruction

Laying tiles includes several stages – preparation space, surface preparation, preparation of the necessary tools, directly laying itself and grouting.

1 / Check The Level

Before you start, make sure that the walls are perpendicular ceiling and floor, and the surface on which you lay the tile, smooth enough. The most simple and quick way to verify this – check the level. If on the floor or walls have old tiles, bring it. And then smooth the surface underneath.

2 / Align Surface

Under the assumed alignment surface coating layer of plaster or moisture-resistant drywall. In the case of drywall process faster and easy. And to work with plaster need to have special skills. Do not forget before applying drywall or plaster to expose landmarks (beacons) on the level. You can also focus on the vertical layers of plaster. This will help you make the surface smooth.

3 / Prime The Surface

The final stage of preparation of the surface is primed. However, the tiles can be laid on a special glue mixture or a solid concrete base, then the surface can not be primed.

4 / Trim Tiles

Proceed to tiling once to prepare the surface and it dries properly. Be prepared for the fact that most likely will have to trim a few tiles. To do this, choose the defective samples. Before trimming, soak the tiles in water. Then take a sharp knife or a regular spatula, then with an effort to draw the score line a few times. Then put the tiles on the edge of a wooden beam, stool and reshape your hands or pliers. This is the easiest way to trim tiles at home, but if you have professional equipment, it is better to use them.

5 / Apply The Adhesive Mixture

Apply to the lower surface of the tile adhesive mortar. Do this sharp-toothed spatula, trying as hard as possible to scratch her teeth. After scratching comes in adhesive and tile holds much safer. Then, using all the same spatula, brush the surface of the adhesive mixture and place it on the tile. To the distance between the seams turned out the same, use the remote crosses.

6 / Check Curves

If in the process you notice that a number of tiles appeared curves should undertake its alignment. But better still is not moving glued tile, as Glue will go outside. So you do not have to do that, using a spirit level constantly check how smooth the resulting surface.

7 / Grouting

Clean joints of glue when all tiles will be laid. Then proceed to the jointing. Grouting – a special blend that is routed between the seams. It protects against water and moisture, and also plays a decorative role. Before you start pointing make sure that the pigment contained in the fugue, does not pollute the tile. Do unravel very carefully, carefully pushing the solution into the joints with a spatula. Please move at right angles, and then cross movements.

8 / Tile Surface Cleaning

The final stage – cleaning. It includes surface treatment and soapy water. Do this when the tile is laid and completely dry.